5,000m drilling programme continues at Twin Peaks Iron Ore Project, WA:
- First pass drilling to test three, outcropping, high grade,DSO (Direct Shipping Ore), hematite prospects.
- Up to 67.7% Fe (Iron) returned from outcrop sampling at the Woolbung Peak prospect
- One CID (Channel Iron Deposit) prospect to be tested.
- Fifteen iron ore prospects delineated within 20km long Twin Peaks trend.MORE